Lewisrowezer
New member
- Joined
- Jul 5, 2019
- Messages
- 57
Hey all, project is in full swing, Ive kicked things off with stripping the bay down as much as is conveniently possible ready for prep work and paint!
Started with an air con degas:
Stripped bit by bit over the past few weeks:
Now she's naked!
Next step includes a full degrease, scuff up and masking of all the usual bits as well as some attention to the underside of the chassis legs (surface rust).
I've decided that I will be painting it at home as it's more cost effective, involving and exciting that way. I have some good friends who are willing to come by and help with it all so it should be fun!
Subframe will be tended to on the side, after it's taken apart I'll get it powdercoated along with the ARB and hubs and get to work on the suspension rebuild! I don't want the build to get confusing so I'll try focus on one thing at a time.
Started with an air con degas:
Stripped bit by bit over the past few weeks:
Now she's naked!
Next step includes a full degrease, scuff up and masking of all the usual bits as well as some attention to the underside of the chassis legs (surface rust).
I've decided that I will be painting it at home as it's more cost effective, involving and exciting that way. I have some good friends who are willing to come by and help with it all so it should be fun!
Subframe will be tended to on the side, after it's taken apart I'll get it powdercoated along with the ARB and hubs and get to work on the suspension rebuild! I don't want the build to get confusing so I'll try focus on one thing at a time.